Inspection |
1. |
Measure the pressure of high pressure line by measuring voltage output between NO.1 and NO.2 terminals. |
2. |
Inspect the voltage value whether it is sufficient to be regular value or not.
|
3. |
If the measured voltage value is not specification, replace the A/C pressure transducer. |
Replacement |
1. |
Disconnect the negative (-) battery terminal. |
2. |
Recover the refrigerant with a recovery/charging station. |
3. |
Disconnect the dual pressure switch connector (3P) (A).
|
4. |
Install in the reverse order of removal. |
Hyundai Tucson (LM) 2010-2015 Owners Manual: Trailer towing equipment
Hitches
It's important to have the correct hitch equipment. Crosswinds, large trucks
going by, and rough roads are a few reasons why you’ll need the right hitch. Here
are some rules to follow:
Do you have to make any holes in the body of your vehicle when you install
a trailer hitch? I ...
Hyundai Tucson (LM) 2010-2015 Service Manual: Inhibitor Switch Troubleshooting
Fault Diagnosis
Fault Diagnosis for Symptom
Major Symptom Expected Cause Items to Check and Measures Shift lever not operating Gear not marked on cluster Shock occurs while shifting lever Warning lamp ON Engine OFF while vehicle is parked Inhibitor switch circuit abnor ...